SR. NO.

GENERIC NAME

MATERIAL GRADE

MANUFACTURER

1

EPOXY POWDER

SCOTCHKOTE 226 N. 226N-

CORROCOAT EP-F 1003 HW

KCCEX44I3 F 103tS)&KCC EX 4413 L 300(5)

NAPGARD 7-25007.2501

VALSPAR-P1PECLAD 2000

3M

JOTUN

KCC

DUPONT

VALSPAR

2

ADHESIVE

ME 0420

LUCALEN G35I0H

FUSABOND 158 DH

COESIVE L8.92.8

POLYGLUE EE-149 V

LUSHAN-L5R

BOREALIS (BOROUGE)

BASELL

DUPONT

M.P.B

HYUNDAI EP <SK CORP.)

GUANGZHOU LUSHAN

3

POLY ETHYLENE

BORCOAT HE3450

BORCOAT HE34S0H

LUPOLEN 4652D SW 00413

LUXENE HDPE 2050

YUHWA HIDEN P60I HI BL FJ-I

ET509B EJ-I.LUSHAN

NEWGEN NEWCOAT 946

BOROUGE

BOROUGE

BASELL

M.P.B

YUHWA KOREA PF.TRO. LTD

HYUNDAI EP

GUANGZHOU LUSHAN

NEWGEN

1.0

RAW MATERIAL:

A

REVIEW OF ALL RAW MATERIAL TEST CERTIFICATES

RAWMATERIAL MANUFACTURER

DATA SHEET

EACH BATCH

AS PER

MANUFACTURERS RECOMMENDATION

RAW MATERIAL TEST CERTIFICATE

R

R

B

RAW MATERIAL TESTING:

 

EPOXY POW DER

GEL TIME

WMEPCCPQC.WI 14.

MPS CL.NO.5.2

&

CAN/CSA Z245.20

ONE TEST FROM EACH BATCH

AS PE RAW MATERIAL

MANUFACTURER

RECOMMENDATION

WMEPC/CP/QC F 004

H

W

 

ADHESIVE

MELT FLOW INDEX

WMEPC/ CP/ QC. /WI/16.

MPS CL.NO.5.2

&

ASTM 1238

ONE TEST FROM EACH BATCH

AS PE RAW MATERIAL

MANUFACTURER

RECOMMENDATION

WMEPC CP/QC. F 004

H

W

 

POLYETHYLENE

MELT FLOW INDEX

WMEPC /CP/ QC/ WI/ 16,

MPS CL.NO.5.2

&

ASTM 1238

ONE TEST FROM EACH BATCH

AS PE RAW MATERIAL

MANUFACTURER

RECOMMENDATION

WMEPCCPQCF004

H

W'

2.0

PROCEDURE QUALIFICATION TEST (AS PER MPS CLAUSE N0.6.0)

2.1

INLET INSPECTION OF BARE PIPES (BFFORF. CLEANING)

A

RECORDING OF PIPE NO. HEAT NO. D1A & WALL THICKNESS

WMEPC/CP/QC /WI/01

EACH PIPE

CLEAR LEGIBLE MARKING FROM BARE PIPE SUPPLIER.

WMEPC/CP QC F/002 A.

WMEPCCP/QC F'06

H

M

B

VISUAL INSPECTION OF BARE PIPE SURFACE

WMEPC/CP/QC/WI/01 &

MPS CL.NO.7.2.8 1

EACH PIPE

DEFECTS REMOVE FROM PIPES AS PER CLIENT SPEC.

WMEPC CP QC F/002 &

WMEPC CP QC F/06

H

R/W

C

CLEANING PRIOR TO

BLASTING

(IF REQUIRED)

WMEPC7CP QC WI0I&

MPS CL.NO.7.3

EACH PIPE

OIL. GREASE. TAR. SALT OR OTHER CONTAMINANTS SHALL BE REMOVED BY SOLVENT CLEANING

WMEPC. CP/QC-T 002 &

WMEPC. CP/QOF 06

H

R/W

D

PREHEATING OF EACH BARE PIPE (If Required)

WMEPC CP QC WI 01&

MPS CL.NO.8 2

EACH PIPE

IF RH IS >85% THEN PIPE IS PREHEATED TO AT LEAST 3°C ABOVE THE DEW POINT.

WMEPC CP/QC F/002 &

WMEPC. CP'QC/F /06

H

M

E

REPAIR OF BARE PIPE DEFECTS

 

EACH DEFECTIVE PIPE

DEFECTS REMOVE FROM PIPES AS PER APPROVED PROCEDURE OF BARE PIPE SUPPLIER

WMEPC/CP/QC/F/002 &

WMEPC/CP/QC/F/06

H

R/W

 

F

RECORDING OF

AMBIENT

CONDITIONS AND

WMEPC/CP/QC/WI/01 &

MPS CL.NO.8 2

EACH PIPE

PIPE SURFACE TEMP,

AMB TEMP. DEW

POINT & RELATIVE

HUMIDITY (RH)

WMEPC/CP/QC/F/002 &

WMEPC/CP/QC/F/06

H

M

2.2

ABRASIVE BLASTING:

A

DEGREE OF

CLEANLINESS

(VISUAL)

DIN 30670 CL. NO 4.1,

MPS CLN0.6.1&

WMEPC/CP/QC/WI 01

EACH PIPE

Sa 2 1/2 (ISO 8501-1)

WMEPC/ CP/QC/F/002

&

WMEPC/ CP/QC/F/06

H

W

B

SURFACE

ROUGHNESS PROFILE

WMEPC/CP /QC /WI /01 &

MPS CL NO.6.1

EACH PIPE

40-100 um Rz

WMEPC/CP/QC/F/002 &

WMEPC/CP/QC/F/06

H

W

C

ELAPSED TIME AFTER BLASTING

WMEPC/CP/QC/WI 01&

MPS CLNO.7.5

AT EVERY STOPPAGE

RH ELAPSED TIME

85% 0.5 HOURS

80% 1.0 HOURS

70% 1.5 HOURS

60% 1.75 HOURS

50% 2.0 HOURS

WMEPC/CP/QC/F/002 &

WMEPC/CP/QC/F/06

H

R/W

D

SALT

CONTAMINATION

WMEPC/CP/QC/WI/21&

MPS CL N0.6.1

EACH PIPE

3ug/cm3 MAXIMUM

(If salt contamination more than 3ug/cm3than pipe shall be treated with phosphoric acid wash)

WMEPC/CP/QC/F/002 &

WMEPC/CP/QC/F/06

H

R/W

2.3

SCOPE : PHOSPHORIC ACID TREATMENT (IF REQUIRED)

A

PHOSPHRIC ACID WASH SOLUTION

WMEPC/CP/QC/WI/02 &

MPS CL.NO.7.6

EACH PREPRATION OF SOLUTION

pH < 2

(By pH indicating paper)

WMEPCCP/QC/F/002

H

M

B

WATER QUALITY CHECK

WMEPC/CP/QC/WI/02&

MPS CL.NO.7.6

AT START AND THAN EVERY FOUR HOUR

TDS < 200ppm

Chlorides <50ppm

WMEPC/CP/QC/F/002

H

M

c

RESIDUAL ACID ON PIPE SURFACE

WMEPC/CP/QC WI02&

MPS CL.NO.7.6

AT START AND THAN EVERY

FOUR HOUR

pH<2

(By pH indicating paper)

WMEPC/CP/QC/F/002

H

M

D

RESIDUAL RINSE WATER ON PIPE

WMEPC/CP/QC/WI/02&

MPS CL.NO.7.6

AT START AND THAN EVERY FOUR HOUR

pH-6-8

(By PH indicating paper)

THE MINIMUM WATER PRESSURE SHALL BE 1000 PSI A WATER AT AMBIENT WATER TEMPERATURE

WMEPC/CP/QC/F/002

H

M

E

ACID DWELL TIME

WMEPC/CP/QC/WI/02&

MPS CL.NO.7.6

AT START AND THAN EVERY FOUR HOUR

>15 SECOND'S PIPE TEMP ,38-66°C OR

(as per dwell time chart)

WMEPC CP/QC/F/002

H

M

2.4

INSPECTION AT COATING APPLICATION

A

PIPE SURFACE TEMPERATURE BEFORE FBE APPLICATION

WMEPC/CP/QC/WI/04&

MPS CL.NO.7.7 & 8.3

EACH PIPE

PIPE TEMP. NOT

EXCEED 260°C OR AS PER MANUFACTURER RECOMMENDATION

WMEPC/CP/QC/F/002

H

R W

B

ADHESIVE FILM TEMPERATURE

WMEPC/CP/QC/WI/04&

MPS CL.NO.7.8 & 8.3

EACH PIPE

190°C - 240°C OR AS PER MANUFACTURER RECOMMENDATION

WMEPC/CP/QC/F/002

H

R W

C

PE. FILM TEMPERATURE

WMEPC/CP/QC/WI/04&

MPS CL.NO.7.9 & 8 J

EACH PIPE

220°C - 260°C OR AS PER MANUFACTURER RECOMMENDATION

WMEPC/CP/QC/F/002

H

R/W

2.5

TESTS ON PARTLY (FBE/ADHESIVE) COATED PIPES:

A

FBE (PRIMER )LAYER DRY FILM THICKNESS

AS PER CLIENT RECOMMENDATION. WMEPC/CP/QC/WI/07

& MPS CLAUSE

NO.8.4. 6.1

ONE PIPE PARTLY COATED

MIN. 120 um

WMEPC/CP/QC/F/002

&

WMEPC/CP/QC/F/01

H

W

B

ADHESIVE LAYER THICKNESS (PARTIALLY COATED)

AS PER CLIENT RECOMMENDATION WMEPC/CP/QC/WI/07

& MPS CLAUSE

NO. 8.4.6.1

ON PARTIALLY COATED PORTION

MIN.I50 um

WMEPC/CP/QC/F/002

&

WMEPC/CP/QC/F/01

H

W

C

VISUAL INSPECTION

OF FBE COATED

PORTION

WMEPC/CP/QC/WI/07

& MPS CLAUSE

NO. 8.4.6.1

EACH PIPE

NO SURFACE DEFECT

WMEPC/CP/QC/F/002

H

R/W

2.6

TESTS ON 3LPE COATED PIPES :

A

OVERALL COATING THICKNESS

AS PER CLIENT RECOMMENDATION.

WMEPC/CP/QC/WI/06

& MPS CL.

NO.6.1.8.4.7.9

EACH PIPE

ON BODY = 1.87 MM

MINIMUM

ON WELD = 10% LESS

THAN THE NOMINAL THICKNESS 1.87 MM

WMEPC/CP/QC/F/002

H

W

B

HOLIDAY

INSPECTION AT 25 KV

DIN 30670 CL. NO. 4.2.2.

5.3.2. MPS CL.NO.6.1

WMEPC/CP/QC/WI/08

EACH PIPE

MAX 1 HOLIDAY PER

SQUARE METER

(HOLIDAY SIZE

LESSER THAN THIS

SHALL BE REPAIR AS

PER APPROVED REPAIR PROCEDURE)

WMEPC/CP/QC/F/002

H

W

C

VISUAL INSPECTION

WMEPC/CP/QC/WI/09 &

MPS CLAUSE NO 8.6.6.1

EACH PIPE

NO SURFACE DEFECTS (Cosmetic water marks on

the PE surface are

acceptable)

WMEPC/CP/QC/F/002

H

W

D

COATING CUT BACK LENGTH & PROTRUDING FBE

WMEPC/CP/QC/WI/09&

MPS CLAUSE NO.8.6.6.1

EACH PIPE

PROTRUDING

FBE

10 TO

40 MM

WMEPC/CP/QC/F/002

H

W

PE CUT

BACKS

130±20 MM

Residual FBE remaining in the surface profile in the end cut back area

is acceptable

E

ADHESION (PEEL)

TEST AT CUT BACK

AREA

DIN 30670CL. NO. 4.2.3. 5.3.3 .MPS CL.NO.6.1.8.5 WMEPC/CP/QC/WI/10

TWO PER PIPE @ 20*5°C

TWO PER PIPE@ 50±5°C

  • 35 N/CM @ 20±5°C
  • I5N/CM@50±5°C

WMEPC/CP/QC/F/004

H

W

F

IMPACT RESISTANCE

TEST

(30IMPACTS ALONG

THE LENGTH)

DIN 30670 CL. NO. 4.2.4. 5.3.4 .MPS CL.NO.6.1.8 5

& WMEPC/CP/QC/WI/l1

ONE PIPE

5J MM (30IMPACTS ON PIPE BODY @ AMBIENT

TEMP)

NO HOLIDAY ON

IMPACT AREA AT 25

KV

WMEPC/CP/QC/F/004

H

W

G

% ELONGATION

DIN 30670 CL. NO. 4.2.6. 5.3.6.MPS CL.NO.6 1.8 5

& WMEPC/CP/QC/WI/I8

5 SAMPLES FROM EACH

PIPE

MIN 200%.

WMEPC/CP/QC/F/004

H

W

H

INDENTATION

HARDNESS

DIN 30670 CL. NO. 4 2.5, 5.3.5 .MPS CL NO.6.1.8 5

& WMEPC/CP/QC/WI/12

TWO SAMPLE FORM EACH PIPE

AT BOTH TEMP

0.2 MM MAX AT 23±2CC

0.3 MM MAX AT 70±2CC

WMEPC/CP/QC/F/004

&

WMEPC/CP/QC/F/014

H

R W

C

VISUAL INSPECTION

WMEPC/CP/QC/WI/09 &

MPS CLAUSE NO 8.6.6.1

EACH PIPE

NO SURFACE DEFECTS (Cosmetic water marks on

the PE surface are

acceptable)

WMEPC/CP/QC/F/002

H

W

D

COATING CUT BACK LENGTH & PROTRUDING FBE

WMEPC/CP/QC/WI/09&

MPS CLAUSE NO.8.6.6.1

EACH PIPE

PROTRUDING

FBE

10 TO

40 MM

WMEPC/CP/QC/F/002

H

W

PE CUT

BACKS

130±20 MM

Residual FBE remaining in the surface profile in the end cut back area

is acceptable

E

ADHESION (PEEL)

TEST AT CUT BACK

AREA

DIN 30670CL. NO. 4.2.3. 5.3.3 .MPS CL.NO.6.1.8.5 WMEPC/CP/QC/WI/10

TWO PER PIPE @ 20*5°C

TWO PER PIPE@ 50±5°C

  • 35 N/CM @ 20±5°C
  • I5N/CM@50±5°C

WMEPC/CP/QC/F/004

H

W

F

IMPACT RESISTANCE

TEST

(30IMPACTS ALONG

THE LENGTH)

DIN 30670 CL. NO. 4.2.4. 5.3.4 .MPS CL.NO.6.1.8 5

& WMEPC/CP/QC/WI/l1

ONE PIPE

5J MM (30IMPACTS ON PIPE BODY @ AMBIENT

TEMP)

NO HOLIDAY ON

IMPACT AREA AT 25

KV

WMEPC/CP/QC/F/004

H

W

G

% ELONGATION

DIN 30670 CL. NO. 4.2.6. 5.3.6.MPS CL.NO.6 1.8 5

& WMEPC/CP/QC/WI/I8

5 SAMPLES FROM EACH

PIPE

MIN 200%.

WMEPC/CP/QC/F/004

H

W

H

INDENTATION

HARDNESS

DIN 30670 CL. NO. 4 2.5, 5.3.5 .MPS CL NO.6.1.8 5

& WMEPC/CP/QC/WI/12

TWO SAMPLE FORM EACH PIPE

AT BOTH TEMP

0.2 MM MAX AT 23±2CC

0.3 MM MAX AT 70±2CC

WMEPC/CP/QC/F/004

&

WMEPC/CP/QC/F/014

H

R W

3.0

REGULAR production

3.1

inlet inspection of bare pipes (before cleaning)

A

RECORDING OF PIPE NO. HEAT NO. DIA &

WALL THICKNESS

WMEPC/CP/QC/WI/01

EACH PIPE

CLEAR LEGIBLE

MARKING FROM BARE

PIPE SUPPLIER.

WMEPC/CP/QC/F/002

&

WMEPC/CP/QC/F/06

H

M

B

VISUAL INSPECTION OF BARE PIPE SURFACE

WMEPC/CP/QC/WI/01& MPS CL.NO.7.2.8 1

EACH PIPE

DEFECTS REMOVE

FROM PIPES AS PER CLIENT SPEC.

WMEPC/CP/QC/F/002

&.

WMEPC/CP/QC/F/06

H

R/W

C

CLEANING PRIOR TO

BLASTING

(IF REQUIRED)

WMEPC/CP/QC/Wl/0I&

MPS CL.NO.7 3

EACH PIPE

OIL. GREASE. TAR.

SALT OR OTHER CONTAMINANTS SHALL BE REMOVED

BY SOLVENT

CLEANING

WMEPC/CP/QC/F/002

&

WMEPC/CP/QC/F/06

H

R/W

D

PREHEATING OF EACH BARE PIPE

(If Required)

WMEPC/CP/QC/WI/01&

MPS CL.NO.8.2

EACH PIPE

IFRH IS >85% THEN PIPE IS PREHEATED TO

AT LEAST 3°C ABOVE THE

DEW POINT

WMEPC/CP/QC/F/002

&

WMEPC/CP/QC/F/06

H

M

E

REPAIR OF BARE PIPE DEFECTS

 

EACH PIPE

DEFECTS REMOVE FROM PIPES AS PER APPROVED PROCEDURE OF BARE PIPE SUPPLIER

WMEPC/CP/QC/F/002

&

WMEPC/CP/QC/F/06

H

R/W

 

F

RECORDING OF

AMBIENT CONDITIONS AND

WMEPC/CP/QC/WI/01& MPS CL.NO.8 2

AT START AND THAN EVERY FOUR HOUR

PIPE SURFACE TEMP

AMB. TEMP. DEW

POINT & RELATIVE HUMIDITY (RH)

WMEPC/CP/QC/F/002

&

WMEPC/CP/QC/F/06

H

M

3.2

ABRASIVE BLASTING:

A

DEGREE OF

CLEANLINESS

(VISUAL)

DIN30670CL.NO 4.1.

MPS CL NO.6.2

& WMEPC/CP/QC/WI/01

EACH PIPE

Sa 2 1/2 (ISO 8501-1)

WMEPC/CP/QC/F/002

&

WMEPC/CP/QC/F/06

H

R/W

B

SURFACE

ROUGHNESS PROFILE

WMEPC/CP/QC/WI/01& MPS CL NO.6.2

FIRST 3 PIPES THAN 1 IN 100 PIPES

40 - 100 um Rz

WMEPC/CP/QC/Tf/002

&.

WMEPC/CP/QC/F/06

H

R/W

C

ELAPSED TIME

AFTER BLASTING

WMEPC/CP/QC WI/01& MPS CL NO.7.5

AT EVERY STOPPAGE

RH ELAPSED TIME

85% 0.5 HOURS

80% 1.0 HOURS

70% 1.5 HOURS

60% 1.75 HOURS

50% 2.0 HOURS

WMEPC/CP/QC/F/002

&

WMEPC/CPQC/F/06

H

R/W

D

SALT

CONTAMINATION

WMEPC/CP/QCWI/21 &

MPS CL NO.6.2

1 IN 100 PIPES

3ug/cm5 MAXIMUM

(If salt contamination more than 3ug/cm5than pipe shall be treated with phosphoric acid wash)

WMEPC/CP/QC/f/002

&

WMEPC/CP/QC/F/06

H

R/W

3.3

SCOPE : PHOSPHORIC ACID TREATMENT (IF REQUIRED)

A

PHOSPHRIC ACID

WASH SOLUTION

WMEPC/CP/QC/WI/02& MPS CL.NO.7.6

EACH PREPRATION OF SOLUTION

pH < 2

(By pH indicating paper)

WMEPC/CP/QC/F/002

H

M

B

WATER QUALITY

CHECK

WMEPC/CP/QC/WI 02&

MPS CL.NO.7.6

AT START AND THAN EVERY FOUR HOUR

TDS < 200ppm

Chlorides <50ppm

WMEPC/CP/QC/F/002

H

M

C

RESIDUAL ACID ON PIPE SURFACE

WMEPC/CP/QC/WI/02&

MPS CL.NO.7.6

AT START AND THAN

EVERY FOUR HOUR

pH<2

(By pH indicating paper)

WMEPC/CP/QC/F/002

H

M

D

RESIDUAL RINSE WATER ON PIPE

WMEPC/CP/QC/WI/02&

MPS CL.NO.7.6

AT START AND THAN

EVERY FOUR HOUR

Ph = 6-8

(By PH indicating paper)

THE MINIMUM WATER PRESSURE SHALL Be

1000 PSI A WATER AT AMBIENT WATER TEMPERATURE

WMEPC/CP/QC/F /002

H

M

E

ACID DWELL TIME

WMEPC/CP/QC/WI/02&

MPS CL.NO.7.6

AT START AND THAN

EVERY FOUR HOUR

>20 SECOND @ PIPE TEMP ,38-66°C OR

(as per dwell time chart)

WMEPC/CP/QC/F/002

H

M

3.4

INSPECTION AT COATING APPLICATION

A

PIPE SURFACE

TEMPERATURE

BEFORE FBE

APPLICATION

WMEPC/CP/QC/WI/04&

MPS CL NO.7.7 & 8 3

RECORD EVERY 30

MINUTES

PIPE TEMP. NOT

EXCEED 260°C OR AS

PER MANUFACTURER RECOMMENDATION

WMEPC/CP/QC/F/002

H

R/W

B

ADHESIVE FILM TEMPERATURE

WMEPC/CP/QC/WI/04&

MPS CL.NO.7.8 & 8.3

RECORD EVERY HOURS

|90°C-240°C OR AS

PER MANUFACTURER RECOMMENDATION

WMEPC/CP/QC/F/002

H

RW

C

PE. FILM

TEMPERATURE

WMEPC/CP/QC/WI/04&

MPS CL.NO.7.9 & 8.3

RECORD EVERY HOURS

220"C - 260°C OR AS

PER MANUFACTURER RECOMMENDATION

WMEPC/CP/QC/F/002

H

RW

3.5

TESTS ON FBF./ADHF.SIVF. COATED PIPES:

A

FBE (PRIMER) LAYER

DRY FILM THICKNESS (PARTIALLY COATED PIPK OR BY PAPER METHOD)

AS PER CLIENT RECOMMENDATION &

WMEPC/CP/QC/WI/07.

MPS CL.NO.6.2

ONCE IN A DAY

MIN. 120 um

WMEPC/CP/QC/F/002 &

WMEPC/CP/QC/F/01

H

R/W

B

ADHESIVE LAYER THICKNESS

(PARTIALLY COATED P1PEOR BY PAPER METHOD)

AS PER CLIENT RECOMMENDATION &

WMEPC/CP/QC/WI/07.

MPS CL.NO.6.2.8.4

ONCE IN A DAY

MIN. I50um

WMEPC/CP/QC/F/002 &

WMEPC/CP/QC/F/01

H

R/W

3.6

TESTS ON 3LPE COATED PIPES :

A

OVERALL COATING THICKNESS

AS PER CLIENT RECOMMENDATION.

WMEPC/CP/QC/WI/06 &

MPS CL.NO.6.2,8.4

EACH PIPE

(Measured at 10 locations and at least 3 points shall be on welds)

ON BODY = 1.87 MM

MINIMUM

ON WELD = 10% LESS THAN

THE NOMINAL THICKNESS

1.87 MM

WMEPC/CP/QC/F/002

H

R/W

B

HOLIDAY

INSPECTION AT 25 KV

DIN 30670 CL. NO 4.2.2.

5.3.2. MPS CL.NO.6.2.8.4

& WMEPC/CP/QC/WI/08

EACH PIPE

MAX. 1 HOLIDAY PER 1 SQUARE METER

(HOLIDAY SIZE LESSER THAN THIS SHALL BE REPAIR AS PER APPROVED REPAIR PROCEDURE)

WMEPC/CP/QC/F/002

H

R/W

c

VISUAL INSPECTION

WMEPC/CP/QC/WI/09&

MPS CL.NO.6,2.8.6

EACH PIPE

NO SURFACE DEFECTS (Cosmetic water marks on the PE surface are acceptable)

WMEPC/CP/QC/F/002

H

R/W

D

COATING CUT BACK LENGTH & PROTRUDING FBE

WMEPC/CP/QC/WI/09&

MPS CL.NO.6.2.8.6

EACH PIPE

PROTRUDING FBE

10 TO 40MM

WMEPC/CP/QC/F/002

H

R/W

PECUT BACKS

130 +/- 20 MM

Residual FBE remaining; in the surface profile in the end cut back area is acceptable

E

ADHESION (PEEL) TEST AT CUT BACK AREA

DIN 30670 CL.NO 4.2.3.

5.3.3.MPS CL.NO 6.2.8.5 WMEPC/CP/QC/WI/10

1 IN 100 PIPES

  • 35 N/CM @ 20±5°C
  • 15 N CM @ 50*3°C

WMEPC/CP/QC/F/004

H

R/W

F

INDENTATIONHARDNESS

DIN 30670 CL. NO. 4.2.5, 5.3.5 .MPS CL.NO.6.2.8 5 & WMEPC/CP/QC/WI/12

ONCE PER SHIFT

(ONE SAMPLE AT EACH TEMP)

0.2 MM MAX AT 23±2°C

0.3 MM MAX AT 70±2°C

WMEPC/CP/QC/F/004 &

WMEPC/CP/QC/F/014

H

R/W

4.0

FINAL INSPECTION:

A

CODIFICATION OF PIPES AFTER HOLIDAY

WMEPC/CP/QC/WI/ 09 &

MPS CL.NO.7.14

EACH PIPE

OK PIPE - NO COLOUR

REJECT - 1 RED BAND

WMEPC/CP/QC /F/002

H

R/W

B

MARKING

WMEPC/CP/QC/WI/09 &

MPS CL.NO.6.2.8.5

EACH PIPE

WELSPUN MIDDLE EAST PIPES

COATING LLC . DAMMAM,

SAUDI ARABIA

CLIENT NAME:-----------

PROJECT NAME:

PIPE SIZE:___________ mm DNX________ MM W.T

PIPF. GRADE:------------- PIPE. LENGTH:----------

PIPE NO. TPI NO. LENGTH.

MAKING SHALL BE PLACED AT A DISTANCE OK MINIMIS 150 MM FROM THE COATING END

H

R/W

C

COATING REPAIR

APPROVED REPAIR PROCEDURE NO RP/12- 13/05-01 Rev 00 Dated 30.09.2012

ALL REPAIRS

NO HOLIDAY AFTER REPAIR.

WMEPC/CP/QC/F/002 &

WMEPC/CP/QC/F/011

H

R/W

D

TEMPORARY CORROSION PROTECTION OF BARE ENDS

 

BARE ENDS FOR EACH PIPE

BARE ENDS SHALL BE PAINTED OUT SIDE WITH A REMOVABLE VARNISH

WMEPC/CP/QC/F/002

H

R/W

E

HANDLING AND STORAGE OF COATED PIPES

AS PER APPROVED PROCEDURE

EACH PIPE

NO COATING DAMAGE

 

H

RW

5.0

verification of instruments

A

DIGITAL TEMPERATURE GAUGE/DIGITAL

PYROMETER

WMEPC/CP/QC/WI/25 &

MPS CL.NO.8.3

EVERY FOUR HOUR

±5%

WMEPC/CP/QC/018

H

R/W

b

COATING THICKNESS

GAUGE

WMEPC/CP/QC/WI/25 &

MPS CL.NO. 8.4

EVERY FOUR HOUR

±5%

WMEPC/CP/QC/018

H

R/W

C

HOLIDAY DETECTOR

WMEPC/CP/QC/WI/25 &

MPS CL.NO.8 4

EVERY FOUR HOUR

±5%

WMEPC/CP/QC/018

H

R/W